RELEASE 2 pre-alpha-3
Related
RELEASE_SCHEDULE
Release team working process
Tasks for testing
- These are the tasks.
- We should test the user visible tasks.
Urgent Goals
Before 2009-02-13 we need to achieve the following:
- product
- repository branching
- Gaining functionality needed for the second release as stated by the schedule
- tuning
- bugs to fix
- things to remove
- things to disable
- files to download
- final delivery
- documentation
- download page
- release documentation
- user documentation
- installation instructions
Documentation
Download Page
Release Document
- released features:
- External
- Page object alignment
- Selecting multiple page objects
- Frame bounding properties, for example margins
- Audio and video support
- Undo manager
- Halos and huds
- More menu support
- Internal
- Property thread safety
- Initial plugin support
- Page Template core support
- Community server
- Build Server
- External
User Documentation
- This should be the documentation for all features available in the released downloadable. This includes new features, old features and updates done to them. This way we could iteratively form the final user docs.
- Currently at ITERATION_03/Release/UserDocumentation
Installation Instructions
- installation instructions (MAC/Windows/Linux). Mac java tweaking instructions.
Product
IMPORTANT
Always write where is the result of the task you completed. This would be the changeset with thorough commit comment for coding and a link to the wiki page for a document.
Repository Branching
Release Tuning
Bugs to Fix
Things to Remove
Things to Disable
Final Delivery
Comments
How to use the branch
- Update your working copy of the repository
- If you have the trunk project imported in Eclipse, change your workspace to a new one (for example "Release")
- Import as a "Maven project" from branches/release01/sophie2-platform
- All your changes from now on will affect only the release branch