Ticket #1424 (closed planned_task: obsolete)
SCS_WIKI_MAINTENANCE_R1
Reported by: | Astea | Owned by: | deyan |
---|---|---|---|
Priority: | 3 | Milestone: | M02_PRE2 |
Component: | PROJECT_COMMUNITY | Version: | 2.0 |
Keywords: | Cc: | ||
Category: | unknown | Effort: | 0.5 |
Importance: | 90 | Ticket_group: | |
Estimated Number of Hours: | Add Hours to Ticket: | ||
Billable?: | Total Hours: | ||
Analysis_owners: | deyan | Design_owners: | deyan |
Imp._owners: | deyan, todor | Test_owners: | |
Analysis_reviewers: | todor | Changelog: | |
Design_reviewers: | peko | Imp._reviewers: | |
Test_reviewers: | Analysis_score: | 3.5 | |
Design_score: | 0 | Imp._score: | 0 |
Test_score: | 0 |
Description (last modified by deyan) (diff)
wiki page: SCS_WIKI_MAINTENANCE_R1 - effort: 0.5d
[[BackLinksMenu]] = Analysis = == Overview == Revise. Fix templates, style and overall arangement of the wiki. Effort : 0.5d == Task requirements == Wiki Page Templates ([wiki:PageTemplates]) * Consider obsolete templates and remove them. * Expand current templates (See Implementation Idea section) * Consider log pages structure and add it in a sentence in the log files template (See Implementation Idea section). * Discuss with team other wiki problems and fix them. * If remains time for the maintenance, fix the logs for current iteration to satisfy the new rules. == Task result == Maintained wiki (Easier work)[[BR]] Maintained [wiki:PageTemplates] == Implementation idea == * Remove [wiki:PageTemplates/AnalysisTemplate] as it is included and expanded in [wiki:PageTemplates/TaskPageTemplate] * Replace the line "^(Link the log of the task here)^" in [wiki:PageTemplates/TaskPageTemplate] with "![[Include(wiki:TASK_NAME_R?_LOG)]]" * Add upper scripted text in [wiki:PageTemplates/TaskLogTemplate] with formatting requirements. These should include: * Bullet indent for each line, now Review bullets are with more indent. Discuss and consider removing additional indent. * Require from the team members to use same nickname for each log. * Define formatting for each task stage - for example: "Analysis: nickname (done:20m) ![[BR]] Review: nickname2 5p (done:20m)" == Related == [wiki:SCS_WIKI_MAINTENANCE_R0][[BR]] [wiki:PageTemplates] == How to demo == Show re factored page templates. = Design = Meet the requirements of the analysis section, see Implementation idea. Note that log files will probably be considered obsolete, but add the requirements for them into the template. = Implementation = Searched for "!AnalysisTemplate" to check if it is referred in other documents, 2 results - in current page and in !AnalysisTemplate page. Deleted the template. ![[BackLinksMenu]] is already part of the !TaskPageTemplate, no need to define it (it was mentioned in the sprint overview, but not included in this task for this reason). Added the following line to the [wiki:PageTemplates/TaskLogTemplate]: "^Delete this line after meeting the requirements. Format: Action: username [comments]; Action: username (done: ?m) [comments]; Action (done: ?h) [comments]; Review: ? by username. [Comments] ^". Considered this format because it is mostly used until now and doesn't look hard to be automatically checked (with python for example. For now applying the template to old logs is not necessary as it is not clear whether we will keep logs or not. Unplanned wiki tuning may be done in this task. = Testing = = Comments = = Log = [[Include(wiki:SCS_WIKI_MAINTENANCE_R1_LOG)]]
Change History
comment:1 Changed 17 years ago by deyan
- Owner changed from Astea to deyan
- Status changed from new to analyzing
- Description modified (diff)
comment:2 Changed 17 years ago by deyan
- Status changed from analyzing to closed
- Resolution set to fixed
- Description modified (diff)
comment:4 Changed 17 years ago by deyan
- Status changed from new to analyzing
analysis passed, migrating to new workflow format
comment:5 Changed 17 years ago by deyan
- Status changed from analyzing to analyzed
- Description modified (diff)
analysis passed, migrating to new workflow format
comment:6 Changed 17 years ago by deyan
- Status changed from analyzed to analysis_accepted
3.5 points analysis passed, migrating to new workflow format
comment:11 Changed 17 years ago by deyan
- Status changed from implementing to implemented
Done implementation. Note that additional wiki tuning belongs to this task
comment:12 Changed 17 years ago by todor
- Status changed from implemented to implementation_accepted
3.5 by todor. The implementation meets the requirements set in the analysis and the design.
comment:13 Changed 17 years ago by todor
- Status changed from implementation_accepted to closed
- Resolution set to fixed
comment:14 Changed 17 years ago by milo
- Status changed from closed to s3c_implementation_ok
- Resolution fixed deleted
comment:15 Changed 16 years ago by deyan
- Design_owners set to deyan
- Imp._owners set to deyan
- Analysis_score set to 0
- Test_score set to 0
- Design_score set to 0
- Imp._score set to 0
- Analysis_owners set to deyan
added an,de,im owners
comment:16 Changed 16 years ago by todor
- Imp._owners changed from deyan to deyan, todor
- Analysis_reviewers set to todor
- Analysis_score changed from 0 to 3.5
comment:18 Changed 15 years ago by deyan
- Status changed from s3c_implementation_ok to closed
- Resolution set to obsolete
Batch update from file query-obsoleted.csv
Note: See
TracTickets for help on using
tickets.
analysis passed, migrating to new workflow format