wiki:SCS_PROJECT_BLOG_R3

Version 2 (modified by deyan, 16 years ago) (diff)

--

Error: Macro BackLinksMenu(None) failed
compressed data is corrupt

Error: Macro TicketQuery(summary=SCS_PROJECT_BLOG_R3, format=table, col=summary|owner|status|type|component|priority|effort|importance, rows=description|analysis_owners|analysis_reviewers|analysis_score|design_owners|design_reviewers|design_score|implementation_owners|implementation_reviewers|implementation_score|test_owners|test_reviewers|test_score|) failed
current transaction is aborted, commands ignored until end of transaction block

Analysis

Overview

The project blog shows the world what happens into Sophie 2 and how

Task requirements

Write two blog posts for this iteration
Post 1:

  • Last sprint overview (added features and functionality)
  • Explain interesting technologies introduced in this sprint
  • What went well
  • What could be better
  • Decided improvements that will be applied

Task result

(The Analysis should contain strict requirements about the end product of the task (for example the result must be source code, the result must be google doc, etc.))

Implementation idea

Use the 0m03-closing.txt in the manage folder in the repository - there are collected the "What went well, what could be better and how to improve.

(Here you can add related tasks that could be useful or helpful.)

How to demo

(In this section you must add instructions for the demo of the task.)

Design

Implementation

(Implementation results should be described and linked here (from the wiki or the repository))

Testing

Comments

(Write comments for this or later revisions here.)