[[BackLinksMenu]]

[[TicketQuery(summary=SCS_PROJECT_BLOG_R3, format=table, col=summary|owner|status|type|component|priority|effort|importance, rows=description|analysis_owners|analysis_reviewers|analysis_score|design_owners|design_reviewers|design_score|implementation_owners|implementation_reviewers|implementation_score|test_owners|test_reviewers|test_score|)]]



= Analysis =
== Overview ==
The project blog shows the world what happens into Sophie 2 and how
== Task requirements ==
Write two blog posts for this iteration [[BR]]
Post 1: 
 * Last sprint overview (added features and functionality)
 * Explain interesting technologies introduced in this sprint
 * What went well
 * What could be better
 * Decided improvements that will be applied
== Task result ==
^(The Analysis should contain strict requirements about the end product of the task (for example the result must be source code, the result must be google doc, etc.))^

== Implementation idea ==
Use the 0m03-closing.txt in the manage folder in the repository - there are collected the "What went well, what could be better and how to improve.

== Related ==
^(Here you can add related tasks that could be useful or helpful.)^

== How to demo ==
^(In this section you must add instructions for the demo of the task.)^

= Design =

= Implementation =
^(Implementation results should be described and linked here (from the wiki or the repository))^

= Testing =

= Comments =
^(Write comments for this or later revisions here.)