Changes between Version 1 and Version 2 of SCS_MAIL_LIST_R7
- Timestamp:
- 07/28/09 14:32:43 (16 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
SCS_MAIL_LIST_R7
v1 v2 7 7 8 8 == Overview == 9 ^(Provide a brief overview of the whole task in its first revision. Stick to the current revision of the task, but keep an eye to the whole task progress, and stay alert for possible smells.)^ 9 There are no new posts in the maillist for the previous two iterations. So we must create at least one post containing information about our progress during the eighth and ninth iterations. 10 10 11 11 == Task requirements == 12 ^(List the necessary requirements that the task must fulfill.)^ 13 12 Create post for the previous iterations which contains: 13 * Information from the retrospections 14 * What went well 15 * What could be better 16 * How to improve 17 * Mention the team building during the eighth iteration and the discussions that were done 18 * Demonstration 19 * add link to the video 20 * brief explanation what was demonstrated 14 21 == Task result == 15 ^(List the end product of the task (for example "Source code", "Wiki page", etc.))^ 22 The result of this task must be a mail sent to the maillist. 16 23 17 24 == Implementation idea == 18 ^(Provide some rough implementation idea(s).)^ 25 * Use the .mm files to collect information about the retrospections and etc. Complete this task in parallel with SCS_PROJECT_BLOG_R7. 26 * Create sample content in the design phase and send it to Nick and Ludmil for recommendations. 27 * Send the approved content during the implementation. 19 28 20 29 == Related == 21 ^(Add links to related tasks that could be useful or helpful.)^ 30 SCS_PROJECT_BLOG_R7 22 31 23 32 == How to demo == 24 ^(Provide instructions for demonstration of the task.)^ 33 Show the mail. 25 34 26 35 = Design =