    2525Like some of you may know we've managed to complete almost all tasks of ITERATION_01, and now we're looking forward to beginning our next iteration. As a fully open source project the information about the progress of Sophie 2.0 is publicly available at http://asteasolutions.net:7080/sophie2/wiki/SCS_SITE_DESIGN/DevelopmentHome where you can find more detailed information about the tasks we're working on and their state. 
    2626 
    27 As a whole during this iteration we've established some fundamental standard about the work processes and created templates for task completion howtos. Most of our work was concentrated on writing documents and templates that will ease our work in the future. Although we've made a lot of changes on them and that cost us a lot of time in refactoring already finished tasks according to the new templates. Now we've have a firm base that we'll use in the future. 
     27As a whole during this iteration we've established some fundamental standard about the work processes and created templates for task completion howtos. Most of our work was concentrated on writing documents and templates that will ease our work in the future. Although we've made a lot of changes on them and that cost us a lot of time in refactoring already finished tasks according to the new templates. Now we have a firm base that we'll use in the future. 
    2828 
    29 Our goal for the next sprint is to increase productivity, so that we can do everything in time. For the second iteration we have 61 planned tasks + 3 unplanned tasks (left from the previous sprint). These should be done until 2008-10-31. 
     29Our goal for the next sprint is to increase productivity, so that we can do everything on time. For the second iteration we have 61 planned tasks + 3 unplanned tasks (left from the previous sprint). These should be done until 2008-10-31. 
    3030We've also took some decisions on how to improve: 
    31  * Focus time - from :15 to :00 of each hour is time to focus. During it no distractions are allowed. If it is really important to communicate with someone, the communication should be done in a way that does not affect the others. 
     31 * Focus time - from :15 to :00 of each hour is time to focus. No distractions are allowed during focus-time. If it is really important to communicate with someone, the communication should be done in a way that does not affect the others. 
    3232 * Task ordering - as part of SCHEDULE_MAINTAINANCE task, the tasks should be ordered in appropriate way. 
    3333 * Maintainance tasks should be done first (and not last). 
    3434 * As part of WIKI_SETUP someone should ensure that everything is up after a power failure. 
    35  * In order people to have better idea what each task is about, we should describe each planned task briefly in the beginning of the sprint. The results of these are in m02-descriptions-bg.txt and m02-descriptions-en.txt 
     35 * In order for people to have better idea what each task is about, we should describe each planned task briefly in the beginning of the sprint. The results of these are in m02-descriptions-bg.txt and m02-descriptions-en.txt 
    3636 * We decided to have a weekly meetings, every monday at 10:00(EEST). They should not be long, so everyone has to be on time. The weeklies consists of a short report of everyone, on "What were you doing the last week", "What will you do the next week", "Impediments", followed by a tech presentation (of a library, technology, tool, etc.) or a design discussions. Everything should be no longer than 1 hour. 
    3737 
    38 I hope this mail will satisfy your interest in the project and its current status, now it is time to work so you can read such mail for the second iteration as soon as possible. 
     38I hope this mail will satisfy your interest in the project and its current status. Now it is time to work so that you can read such mail for the second iteration as soon as possible. 
    3939 
    4040= Implementation =