Version 4 (modified by peko, 17 years ago) (diff) |
---|
Analysis:
- Verify the existing dependencies in work breakdown structure document(make automatic script to check if the revisions are correct in the related tasks).
- Add more dependencies for base tasks.
- Check manually if the created schedule is possible(this can be done by the generated exports or task juggler calendars).
Design:
- Dependencies are stored in resources ODS in a column called depends.