[[BackLinksMenu]] [[TicketQuery(summary=SCHEDULE_MAINTENANCE_R2, format=table, col=summary|owner|status|type|component|priority|effort|importance, rows=description|analysis_owners|analysis_reviewers|analysis_score|design_owners|design_reviewers|design_score|implementation_owners|implementation_reviewers|implementation_score|test_owners|test_reviewers|test_score|)]] = Analysis = == Overview == As schedule maintenance is a routine task, the most of the requirements from previous iterations are applicable. == Task requirements == * Create page for this iteration (Already created, but includes planned tasks only [wiki:ITERATION_03] * Add the tasks for this iteration * unfinished tasks from the previous sprint (if any) * unplanned tasks - Unplanned tasks should be discussed with the team in order to decide which tasks that are planned for other iterations need effort in this iteration. * remote tasks - Remote tasks are decided in sprint opening. Further information on what tasks should be added will be available in [source:/manage/reports/m03/] in sprint opening log. * For each task you should create a ticket with link to a wiki page for this revision in decription field. Other required fields are: * Priority - [1 .. 5] * Importance - [10 .. 99] * Effort - [0.5+] * Component == Task result == The result should be iteration page containing all needed tickets. == Implementation idea == Use this page [wiki:SCHEDULE_WBS_TIME_ALLOC], discuss which tasks need attention and add them as unplanned tasks. (Do this at the sprint opening). Review and include tasks from the log. == Related == [wiki:SCHEDULE_WBS_TIME_ALLOC] == How to demo == ^(In this section you must add instructions for the demo of the task.)^ = Design = = Implementation = ^(Implementation results should be described and linked here (from the wiki or the repository))^ = Testing = = Comments = ^(Write comments for this or later revisions here.)