Changes between Version 2 and Version 3 of SCHEDULE_MAINTENANCE_R2
- Timestamp:
- 12/01/08 09:24:46 (16 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
SCHEDULE_MAINTENANCE_R2
v2 v3 6 6 As schedule maintenance is a routine task, the most of the requirements from previous iterations are applicable. 7 7 == Task requirements == 8 * Create [source:/manage/reports/m03/0m03-opening.txt] and log the opening 8 9 * Create page for this iteration (Already created, but includes planned tasks only [wiki:ITERATION_03] 9 10 * Add the tasks for this iteration … … 19 20 == Task result == 20 21 The result should be iteration page containing all needed tickets. 21 22 22 == Implementation idea == 23 23 Use this page [wiki:SCHEDULE_WBS_TIME_ALLOC], discuss which tasks need attention and add them as unplanned tasks. (Do this at the sprint opening). Review and include tasks from the log. 24 24 25 25 == Related == 26 [wiki:SCHEDULE_WBS_TIME_ALLOC] 27 26 [wiki:SCHEDULE_WBS_TIME_ALLOC] [[BR]] 27 [source:/manage/reports/m03/0m03-opening.txt] [[BR]] 28 28 == How to demo == 29 ^(In this section you must add instructions for the demo of the task.)^ 30 29 [source:/manage/reports/m03/0m03-opening.txt] [[BR]] 30 [wiki:ITERATION_03] 31 31 = Design = 32 32