Changes between Initial Version and Version 1 of SCHEDULE_MAINTENANCE_R2


Ignore:
Timestamp:
12/01/08 09:01:23 (16 years ago)
Author:
deyan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • SCHEDULE_MAINTENANCE_R2

    v1 v1  
     1[[BackLinksMenu]] 
     2 
     3[[TicketQuery(summary=TASK_NAME_HERE, format=table, col=summary|owner|status|type|component|priority|effort|importance, rows=description|analysis_owners|analysis_reviewers|analysis_score|design_owners|design_reviewers|design_score|implementation_owners|implementation_reviewers|implementation_score|test_owners|test_reviewers|test_score|)]] 
     4= Analysis = 
     5== Overview == 
     6As schedule maintenance is a routine task, the most of the requirements from previous iterations are applicable. 
     7== Task requirements == 
     8 * Create page for this iteration (Already created, but includes planned tasks only [wiki:ITERATION_03] 
     9 * Add the tasks for this iteration 
     10  * unfinished tasks from the previous sprint (if any) 
     11  * unplanned tasks - Unplanned tasks should be discussed with the team in order to decide which tasks that are planned for other iterations need effort in this iteration. 
     12  * remote tasks - Remote tasks are decided in sprint opening. 
     13Further information on what tasks should be added will be available in [source:/manage/reports/m03/] in sprint opening log.  
     14 * For each task you should create a ticket with link to a wiki page for this revision in decription field. Other required fields are: 
     15  * Priority - [1 .. 5] 
     16  * Importance - [10 .. 99] 
     17  * Effort - [0.5+] 
     18  * Component 
     19== Task result == 
     20The result should be iteration page containing all needed tickets. 
     21 
     22== Implementation idea == 
     23Use this page [wiki:SCHEDULE_WBS_TIME_ALLOC], discuss which tasks need attention and add them as unplanned tasks. (Do this at the sprint opening). Review and include tasks from the log. 
     24 
     25== Related == 
     26[wiki:SCHEDULE_WBS_TIME_ALLOC] 
     27 
     28== How to demo == 
     29^(In this section you must add instructions for the demo of the task.)^ 
     30 
     31= Design = 
     32 
     33= Implementation = 
     34^(Implementation results should be described and linked here (from the wiki or the repository))^ 
     35 
     36= Testing = 
     37 
     38= Comments = 
     39^(Write comments for this or later revisions here.)