Changes between Version 8 and Version 9 of PLATFORM_STANDARDS_GENERAL_R0


Ignore:
Timestamp:
09/08/08 17:46:18 (17 years ago)
Author:
fire4o
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PLATFORM_STANDARDS_GENERAL_R0

    v8 v9  
    88== Design == 
    99 * Task results can be: 
    10   * a specification 
    11   * a development document 
     10  * a specification (produced in the analysis phase of each task) 
     11  * a development document (produced in the design phase). Can also be the final result of a task. 
    1212  * a diagram (usually as a part of a specification or development document) 
    1313  * a how-to (usually as a part of a development document) 
    14   * source code 
    15   * a review 
    16  * Each task should have its page in Sophie 2.0 wiki. It should have different parts for the task's phases. These parts can contain either text and images or links.  
    17   *  
     14  * source code (produced in the implement phase of most tasks). 
     15  * a review (done after each phase). This decides whether the task can proceed to the next phase. 
     16 * Each revision of every task should have its page in Sophie 2 wiki. It should have different parts for the task's phases. These parts can contain either text and images or links. 
     17  * source code is kept in the Sophie 2 repository. 
     18  * specification may be part of the System Requirements Specification(SRS). If this is the case it should be in the SRS tree of the wiki. 
     19  * some special tasks may have their result stored in separate wiki pages. This task is an example.