Changes between Version 1 and Version 2 of PLATFORM_INFRASTRUCTURE_OVERVIEW_R1
- Timestamp:
- 10/10/08 11:06:58 (17 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
PLATFORM_INFRASTRUCTURE_OVERVIEW_R1
v1 v2 2 2 3 3 = Analysis = 4 ^(The purpose of the analysis is to give as much as possible of the needed information for designing and implementing the task.)^5 6 4 == Overview == 7 ^(The analysis of the first revision of each task should contain a brief overview of the whole task. Stick to the current revision of the task, but keep an eye to the whole task progress, and stay alert for possible smells.)^ 8 5 The setup of the developers machines. The document should be fullfilled. What are the things on the developers machine + links with resource on the machine and outside it that are useful. Update the current document. 9 6 == Task requirements == 10 7 ^(Necessary requirements that the task must fulfill.)^